2017 WDCSITE MDTA Meeting Summary

Held August 24, 2017

WDCSITE held a well-attended technical meeting at MDTA’s office in White Marsh, MD, where we were addressed by knowledgeable speakers regarding their respective work. The event also provided a great opportunity to catch up with fellow colleagues during lunch from the local Italian deli, Pastore’s. The meeting on August 24th was kicked off by the ITE Membership video, which can be viewed on YouTube HERE. Then, Will Pines, representing MDTA, and Neil Leary and Jeff Cheng, representing Whitman, Requardt & Associates, presented, followed by Subrat Mahapatra from SHA’s Office of Planning and Preliminary Engineering.

The former presentation detailed the Canton Viaduct Bridge Replacement project, which, due to its unique limitations, is an extensive traffic engineering “mega project”. The latter, presented by Subrat, provided insight on the ongoing efforts in Maryland to leverage technology and existing resources to provide innovative solutions in Transportation Systems Management and Operations (TSM&O). We have shared their presentations via email with all those who attended.

We thank our speaker guests and our hosts at MDTA and we look forward to future events at this venue!

Will Pines (MDTA) presenting with Neal Leary and Jeff Cheng (WRA)

Subrat Mahapatra (SHA OPPE)

2017 Technical Meeting at MDTA

Thursday, August 25, 2017

Please join your fellow WDCSITE colleagues for two presentations from MDTA and SHA providing insight on current local projects and programs.

Venue is Maryland Transportation Authority’s GEC Office in the White Marsh area, northeast of Baltimore. Meeting will be held in the conference room, direction provided at the reception lobby of the office building.

Lunch to be served following the presentations. It is anticipated that PDH credit(s) will be available. Payment will be taken electronically only through Paypal portal.

AGENDA:

10:00 AM – 10:15 AM – Registration

10:15 AM – 11:45 AM – Presentations:

  • Canton Viaduct Bridge Replacement – A Mega-Traffic Project
    • Will Pines, Director of Project Development, Office of Engineering and Construction, Maryland Transportation Authority
    • Neil Leary and Jeff Cheng, Traffic Engineering, WRA
  • TBD
    • Subrat Mahapatra, Office of Planning & Preliminary Engineering, Maryland State Highway Administration

11:45 AM – 12:00 PM – Lunch Served

COST:

  •     Public Sector/Retired:  FREE
  •     Private Sector ITE Member: $15.00
  •     Private Sector Non-ITE Member:$25.00
  •     Full-time Students are FREE

PARKING: 

Please use the on site parking in front of building.

Please click on the link below to register for the 2017 Technical Meeting at MDTA.

Should you have any questions, please contact David Duarte (410-316-2491) for further details.

Register Now!

I can’t make it